(To fix this product in your Doorstep, Contact our below listed Service centre)

Specification

  • Category: Pen Drive

  • Brand: EVM

  • Model: EnStore 4 In 1 OTG

  • Capacity: 64GB

  • Interface: USB 3.0 (Backward Compatible with USB 2.0)

  • Connector Type: 4-in-1 (USB-A, Type-C, Lightning, Micro USB/OTG)

  • Read Speed: Up to 100 MB/s (Approx)

  • Write Speed: Up to 30 MB/s (Approx)

  • Design: Multi-Connector Rotating / Compact Design

  • Material: Metal Body (Aluminium Alloy)

  • Compatibility: Windows, Mac OS, Android (OTG), iOS Devices

  • Supported Devices: Laptop, Desktop, Smartphone, Tablet

  • Features: Direct File Transfer Between Devices, Plug & Play, Multi-Device Support

  • Special Feature: Direct Video & Music Playback Support

  • Dimensions: Approx 60 × 18 × 8 mm

  • Weight: Approx 18g

  • Operating Temperature: 0°C to 60°C

  • Storage Temperature: -20°C to 85°C

  • Warranty: 1 Year Manufacturer Warranty


Warranty & Support: Customers can claim the warranty from our Below Mentioned Service Partners.

1.Matrix Computers and Peripherals
No.7, Palace ward, Post Office Junction,
Kuzhithurai, K.K. Dist (TN) Pin: 629163

2.Wintech.
No. 23/79, Panicker’s Complex,
Post Office Junction, Kuzhithurai, K.K Dist (TN)
Pin: 629163

Write a review

Note: HTML is not translated!
    Bad           Good
Captcha

EVM EnStore 4 In 1 OTG 64GB USB 3.0 Type C Pen Drive

  • Brand: EVM
  • Product Code: EVM EnStore 4 In 1 OTG
  • Availability: In Stock
  • ₹950.00


Tags: EVM EnStore 4 In 1 OTG 64GB USB 3.0 Type C Pen Drive