(To fix this product in your Doorstep, Contact our below listed Service centre)
Specification
Product Name: EVM 512GB SATA SSD
Category: Internal Solid State Drive (SSD)
Brand: EVM
Model: SATA SSD
Capacity: 512GB
Form Factor: 2.5-inch (7mm)
Interface: SATA III (6Gb/s)
NAND Type: 3D NAND
Sequential Read Speed: Up to 550 MB/s
Sequential Write Speed: Up to 500 MB/s
Features:
• SLC Caching
• TRIM Support
• SMART Monitoring
• Error Correction (ECC)
• Low Power Consumption
• Shock Resistant
Operating Temperature: 0°C to 70°C
Dimensions: 100 × 69.85 × 7 mm
Weight: Approx. 45g
Compatibility: Desktop & Laptop (2.5" SATA Bay)
Warranty: 5 Years
Warranty & Support: Customers can claim the
warranty from our Below Mentioned Service Partners.
1.Wintech.
No. 23/79, Panicker’s Complex,
Post Office Junction, Kuzhithurai, K.K Dist (TN)
Pin: 629163
Phone: 6382939025
*Note this image is for indicative purpose only
Tags: EVM 512GB SATA SSD

